Please see below a schedule of annual planned works within the Shire. This schedule is subject to change due to weather conditions, emergencies and other operational factors.
Parks and Gardens SchedulePlease see below a schedule of annual planned works within the Shire. This schedule is subject to change due to weather conditions, emergencies and other operational factors.
Current Program of Works for 2018-19 DRAINAGE Location Project Description Project Status Dalyellup College Drainage Basin Dalyellup Investigation (Report) – Flooding of playing field Planning Stage Drainage Asset Register Shire wide Update asset register with all available information and make publicly available Planning Stage Shire of Capel Drainage Strategy Boyanup Boyanup LWMS to support Drainage Strategy Endorsed by Council Jilley Road Gelorup Replace Existing Culvert + Headwalls Planning Stage Gavin’s Road Capel Replace Existing Culvert + Headwalls Planning Stage Weld Road Capel River Replace Existing Culvert + Headwalls Planning Stage Weld Road Capel River Replace Existing Culvert + Headwalls Planning Stage Roe Road Capel Correction of ponding to the pram ramp adjacent to Capelberry. Estimated January Frances Road Gelorup Extend culvert south 4.5m to allow for footpath construction. Relocate adjacent headwall and backfill verge. Planning Stage Hasties Rd Drain reserve TPS 3 outstanding works 2f Gelorup Reshape the open channel from Hasties Rd to Five Mile Brook to provide a long term manageable cross-section for the main flow path of water from catchments A and B. Planning Stage Reshape Lake McNish TPS 3 outstanding works 2h Gelorup Confirm volume and reshape detention basin north of Hasties Rd Planning Stage Open Drain west of Jules Rd between R 29470 and R 45489 Gelorup Undertake survey and implement works to reinstate shallow drain through reserve and BCGS land to alleviate flooding of Lot 115 Strachan Crt Shallow Drain Regraded PUBLIC OPEN SPACE & LAND Location Project Description Project Status Capel Rec Ground – Remediation Capel Part 1 – SCMP to be completed (MC) Part 2 – Site remediation (SF) – carry over to 18/19 Planning Stage Wonil Crescent Dalyellup Upgrade to playground equipment Planning Stage Central Lakes – Senior playground Dalyellup Upgrade to playground equipment Planning Stage Ferndale Park Dalyellup Install new shade sail Planning Stage Boyanup Recreation Ground Area Exercise Equipment Boyanup Upgrade to exercise equipment Planning Stage Capel Civic Precinct – Stage 3 Capel Construction & Delivery of Capel Civic Precinct Stage 3 Planning Stage Capel Civic Precinct – Stage 3A Capel Construction & Delivery of Capel Civic Precinct Stage 3A car park Planning Stage Shire Entry signs x 3 Picton. Boyanup Rd. Tuart Drive. Goodwood Road. Install 3 x new Shire Entry signs Planning Stage Town Entry Statement Spurr Road, Capel Install new Town Entry Statement Planning Stage Lions Park shelter & BBQ Boyanup Install new shelter, BBQ, pad, fence and relocate existing bench Completed Native Garden Capel Cemetery Introduce low maintenance garden Planning Stage Fettlers Park Master Plan – Design Boyanup Detailed Design of Fettlers Park Development Planning Stage Age Friendly Seating Shire wide Seating Completed Capel Cemetery Capel Signage, kerb and road repairs Planning Progressing Peppermint Grove Beach fencing Peppermint Grove Beach Fencing Planning Stage Shire wide – POS signage, seats, shelters, bins Shire wide POS signage, seats, shelters, bins Waiting for MRWA approval Galvanized Leaves- Public Art Capel Install Tuart leaves Sculpture with lighting Quotes received PATHS Location Project Description Project Status Bussell Highway Dual Use Path (Phase 3) Dalyellup/ Gelorup Design and Construction 2.5m wide concrete path Planning Stage Pedestrian Ramp Improvements Dalyellup Various new pedestrian ramps, in response to customer requests Quotes received South West Hwy Boyanup replace existing asphalt path Liaison with Stakeholders South West Hwy Boyanup replace existing asphalt path Liaison with Stakeholders South Western Hwy – Railway Xing Boyanup Planning Stage West Rd Capel Construct 2.1m wide concrete path Completed ROADS Location Project Description Project Status Boundary Road Boyanup 2nd coat seal (10mm) Planning Stage Elgin Road Elgin Reconstruct; 6.2m seal + 0.9m shoulders Start Date 18 Feb 2019 Elgin Road Elgin 2nd coat seal (10mm) Planning Stage Ludlow North Road Ludlow Improve and widen intersection (Stirling Road) Design in Progress Clarke Road Elgin Reseal to 4.0m Completed Clarke Road Elgin Reseal to 6.2m Completed Clarke Road Elgin Reseal to 4.0m Completed Hurst Road Boyanup Plane and asphalt overlay Due to Commence 7 January 2019 Kilpatrick Road North Boyanup Gravel resheet Completed Fowler Road Boyanup Gravel resheet Due to Commence 7 January 2019 Hansen Road Stratham Gravel resheet Completed Hansen Road Stratham Clearing, realignment and gravel sheeting Near Completion Brookdale Road Boyanup Widen formation to 9.0m, improve drainage, clear verges Estimated to Start end of January 2019 Simmons Street Boyanup Plane and asphalt overlay Due to Commence 7 January 2019 Properjohn Road Capel Reseal to 7.0m Completed Jules Road North Gelorup Widen formation to 9.0m – Design and preconstruction Design in Progress Kent Road Stratham Cul-de-sac; repair pavement, install edge kerb, asphalt overlay Completed Child Place Stratham Cul-de-sac; repair pavement, install edge kerb, asphalt overlay Completed Ducane Road Gelorup Reseal at 6.2m (10mm) Completed Calinup Road Stratham Design for Reconstruction – Shoulder Slumping Design in Progress Boyanup Road West Boyanup Realign & widen intersection Completed Boyanup Road West Boyanup Realign and widen intersection (Elgin Road) – 2nd coat seal Completed Boyanup Road West Boyanup Final Design, Staging & Schedule Preparation Ongoing Planning Dalyellup Bvd Dalyellup Asphalt overlay and kerb repairs Estimated to Start February 2019 Dalyellup Bvd Dalyellup Asphalt overlay and kerb repairs Estimated to Start February 2019 Norton Promenade – Left Dalyellup Asphalt overlay and kerb repairs Estimated to Start February 2019 Norton Promenade (1510) Dalyellup Asphalt overlay and kerb repairs Estimated to Start February 2019 Norton Promenade – Right Dalyellup Asphalt overlay and kerb repairs Estimated to Start February 2019 Parade Road – Left Dalyellup Pavement rehabilitation and asphalt resurfacing (Murtin Road) Pre works information advised Parade Road – Right Dalyellup Pavement rehabilitation and asphalt resurfacing (Murtin Road) Pre works information advised BUILDINGS Location Project Description Project Status Boyanup POS Recreation Facilities Boyanup Upgrade Bowling Club Sports Pavilion + facilities Due to start 10 January 2019 Jamison Footbridge Capel Upgrade Planning Stage Timber Structures -2 Shire wide North Beach Access Stairway Dalyellup Beach Completed Timber Structures -3 Shire wide DalyellupTimber Structures – lake link ramp Minor Small Finalisation Roof Access Anchor Points Shire wide Upgrade Completed BRIDGES Location Project Description Project Status Bentley Road Bridge Ludlow Waterways analysis Planning Stage Dardanup West Road Bridge Dardanup Includes approach road of DW Rd Planning Stage