Just letting everyone know that sections of the shared path along the foreshore are currently being repaired with asphalt. This is a temporary measure to fix the imperfections and make the surface safer over summer. Later in 2019, the areas will be properly repaired with concrete. We choose to do the concreting in the cooler months when it less disruptive to the public and the concrete doesn’t set too quickly and is less likely to crack. There are various sections being repaired from Beaumaris through to Brighton.