Toowoomba Regional Council (TRC) has lodged a development application to construct a modern waste transfer station at Kleinton to cater for the region’s growth in the north.
TRC Water and Waste Committee Chair Cr Nancy Sommerfield said the new transfer station would be built over the existing landfill site, which has reached capacity, as well as an adjacent parcel of land that is already owned by Council.
“This state-of-the-art facility will be the fifth project delivered under the Waste Services Infrastructure Plan,” Cr Sommerfield said.
“The new facility will deliver environmental benefits to the area and much greater opportunities for recycling.
“The new transfer station will look familiar to customers because the design is a smaller version of the new Greater Toowoomba Waste Management Facility.
“As a region, our communities have embraced the need to reduce the amount of waste going into landfill and this new facility will build on our region’s culture to ‘reduce, reuse and recycle’.
“The new facility will be a cleaner and tidier waste solution with the waste stored on pavement and transported to landfill locations offsite.
“The design of the transfer station will help to reduce the odour, dust and animal/rodent control required.
“Litter prevention controls will be put in place to contain windblown litter from the facility.
“The current waste facility will continue to function while construction is underway, although there will be some temporary changes to traffic flow and there may be some temporary changes to operating hours, depending on construction requirements.
“Council will try to make the transition to the new facility as smooth as possible for customers and we will continue to update the community on construction progress.
“The existing landfill site will be rehabilitated as part of the project. These rehabilitation works, which are a requirement under the existing Environment Authority for the site and not part of the development application, will be starting soon.”
For more information about the proposed Kleinton Waste Management Facility upgrade project, visit www.tr.qld.gov.au/majorprojects or contact our Stakeholder Engagement Officer on 4688 6193.
Last Updated: Friday, 01 March 2019 13:05