During a routine bridge inspection of Jensens Crossing Bridge several structural defects were found in two of the bridge girders. The bridge has been closed until the defects can be repaired. It is expected that the bridge will be opened to traffic on 14 August. The 5 tonne load limit on the bridge will remain in effect when the bridge reopens.