Published: Tuesday, 25 February 2020 at 2:04:06 PM
Notice is hereby given that the Shire of Chapman Valley has reviewed its current policies and prepared the following Local Planning Policies for public comment.
1 Residential & Rural-Residential
1.1 Ancillary Dwellings 1.2 Grouped Dwellings 1.3 Home Based Business 1.4 Outbuildings 1.5 Repurposed & Second-hand Buildings
2 Commercial & Industrial
2.1 Extractive Industry 2.2 Rural Industry 2.3 Rural Tourism 2.4 Workforce Accommodation
3 Environment, Natural Resources & Waste
3.1 Tree Farms 3.2 Intensive Agriculture
4 Transport & Infrastructure
4.1 Development adjacent to the proposed Oakajee to Narngulu Infrastructure Corridor and the Oakajee to Tallering Peak Rail Corridor
5 Design Guidelines & Precinct Plans
5.1 Building Envelopes
6 Planning Procedures
6.1 Consultation
7 Miscellaneous
7.1 Commercial Vehicles 7.2 Event Application 7.3 Sea Containers 7.4 Signage 7.5 Subdivision Standards
The PROPOSED Shire of Chapman Valley Local Planning Policies can be viewed by clicking on the following link:
Proposed Local Planning Policies
The Shire’s Local Planning Scheme No.3 was gazetted in 2019 and was required to be updated to reflect the requirements of the Planning and Development (Local Planning Schemes) Regulations 2015. The Regulations and Scheme No.3 introduced standardised provisions and definitions that are now required to be reflected in the Shire’s Local Planning Policies to ensure consistency.
The Western Australian Local Government Association also released in 2019 a Local Planning Policy template that was prepared through a Working Group comprising representatives of WALGA, the Department of Planning, Lands & Heritage, and Local Government, and sought to produce a standardised statewide policy layout.
A copy of the CURRENT Shire of Chapman Valley Local Planning Policies can be viewed on the Shire website at:
https://www.chapmanvalley.wa.gov.au/local-planning-policies.aspx
Should you wish to make a submission on any of the proposed Local Planning Policies it can be made on the Shire Submission Form (link provided below) and must be lodged in writing with the undersigned on or BEFORE 4:00PM TUESDAY 31 MARCH 2020.
Local Planning Policy Submission Form
Maurice Battilana
CHIEF EXECUTIVE OFFICER
Back to All News