Sewer works in Condobolin
Lachlan Council News 21 Apr 2020
Sewer works in Condobolin 21 Apr 2020 4:40 PM -

Lachlan Shire Council has contracted Interflow to undertake sewer rehabilitation works in Condobolin.

Commencing on Thursday morning (23/04/2020), Interflow will be conducting sewer relining, closed circuit television (CCTV) inspection of the main sewer pipes and cleaning works. Residents are advised they may experience an increase in noise, vehicle movement and odours, though every effort will be made to minimise these impacts.

Residents are advised they do not need to be home, however Interflow staff may need to access some properties.

If access to your property is required, you will be contacted by phone wherever possible and door knocking will occur only in rare cases. If Interflow does not have your phone number a letter will be left in your letterbox with contact details on it.

If you do not wish the work to be completed on the day mentioned on the calling card, please call the number on the card to arrange a more suitable day or time.

Works are planned in the following areas:

·       Moulder St / Adams Ave / Craft Cres

·       Molong St / Hay St / Goobang St / Mooney St / Stenhouse St

·       Goodwill St

It is advised that toilet lids are held down by an object weighing at least 2kg during the cleaning works.

For further information on the works please contact Interflow’s Project Manager John Meere 0408 118 315.