Gympie Regional Council construction and road maintenance crews have a busy fortnight ahead, working on a number of projects throughout the region. The project list includes:

*Road construction*

- Investigator Avenue, Cooloola Cove (TIDS) (Nautilus Drive – Queen Elizabeth Drive)

- Amamoor Creek Road – (TIDS) Chainage 4.5km Floodway Upgrade

- Hughes Terrace – Asphalt Overlay

- David Drive, Curra – Street Renewal

- River Road – Street Renewal (Jaycee Way – Gladstone Street)

- Phoenix Lane – Stormwater Drainage Works

*Road maintenance* George Street – Grading;

Tingani Road – Grading;

Bath Street – Grading;

Henry Street – Grading;

Hoopers Road – Unsealed shoulder repairs;

Tegan Road – Unsealed shoulder repairs;

Settlement Road - Unsealed shoulder repairs;

Donald Drive – Unsealed shoulder repairs;

Kirsten Drive – Unsealed shoulder repairs;

Rodney Road - Unsealed shoulder repairs;

Beryl Crescent - Unsealed shoulder repairs;

Simpson Road – Drainage repairs;

Edward Street – Stormwater repairs;

Cogan Street – Stormwater repairs;

Calton Terrace – Stormwater repairs;

Glen Eden Drive – Footpath repairs;

Brisbane Road – Footpath repairs;

Pine Street – Kerb and channel repairs;

Main Street – Kerb and channel repairs;

Excelsior Road – Kerb and channel repairs;

Tin Can Bay Road – Shoulder repairs;

Old Maryborough Road – Stormwater repairs;

Mulcahy Terrace – Stormwater repairs;

Glen Eden Drive – Stormwater repairs

Reef Street – Footpath repairs;

Knobby Glenn Road – Grading;

Gympie-Brooloo Road – Shoulder repairs;

Ash Street – Asphalt repairs;

James Street – Asphalt repairs;

Hartwig Road – Gravel re-sheeting;

Moy Pocket Gap Road – Grading

Walker Road – Grading;

Green Trees Road – Shoulder repairs;

Inskip Avenue – Asphalt repairs;

Tamaree Road – Shoulder repairs;

Oakfield Road – Asphalt repairs;

Timbertop Court – Asphalt repairs;

Peacons Pocket Road – Grading;

Maryborough Cooloola Road – Shoulder repairs.

For more info on Council projects, head to www.gympie.qld.gov.au.