Motorists are advised of changed traffic conditions on the Riverina Highway near Lowesdale as essential maintenance work continues.
Single lane closures are in place for the installation of concrete barriers as part of the Wangamong Creek Bridge upgrade to provide a safer and wider structure for transport customers.
Work will be carried out weekdays between 7am and 6pm and is expected to be completed in late May, weather permitting.
Heavy vehicles will not have access through the worksite for the duration of the project with detours in place.
Heavy vehicles will be detoured at Corowa via Honour Road, Spring Drive at Mulwala and Savernake Road, and will rejoin the Riverina Highway at Savernake.
Heavy vehicles travelling on the Federation Highway from Coreen will be detoured via Corowa, Mulwala, and will rejoin the Riverina Highway at Savernake.
Detours will add an extra 15 minutes to journeys with motorists advised to drive to the conditions and to follow the directions of signs and traffic control.
Traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.
Transport for NSW thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.