H20 a GO for Blackwater water tower project

Posted on May 17, 2023

Works have now been completed on the Blackwater water tower roof replacement after asbestos was discovered during routine maintenance in March.

All asbestos has been removed safely and new zincalume corrugated roofing was installed, with a total surface area of 180 sqm. A permanent handrail was also installed.

The public space is now accessible and park bookings have re-opened.

If you have any enquiries, please contact council on 1300 242 686.